首页> 外文期刊>Mineral Planning >400Mt extension of Glensanda Quarry
【24h】

400Mt extension of Glensanda Quarry

机译:Glensanda Quarry的400Mt延伸

获取原文
获取原文并翻译 | 示例
           

摘要

In September Highland Council approved the extension of the extraction area at Glensanda Quarry by 81 ha. This would release an additional "400Mt or so" of reserves. Although substantial reserves exist within the present consented site, Foster Yeoman sought permission to work into the application area in the shorter term while the glory hole and primary crusher were still at the higher level. The enlarged total area would result in the glory hole being more centrally positioned but there would be a switch in working procedure to the use of a mobile rather than a fixed primary crusher. The application was supported by an Environmental Statement. Since this planning application was submitted, Foster Yeoman Ltd had been acquired by Aggregate Industries Ltd, which had confirmed that the company was in full support of the planning application and the Community Fund agreement.
机译:9月,高地理事会批准将Glensanda Quarry的开采面积扩大81公顷。这将释放额外的“ 400Mt左右”储备。尽管目前同意的地点内有大量储量,但福斯特·约曼(Foster Yeoman)寻求在短期内准许进入应用区域的工作,而荣耀孔和一级破碎机仍处于较高水平。扩大的总面积将导致荣耀孔的位置更加居中,但工作程序将转换为使用移动式而不是固定式主破碎机。该申请得到了环境声明的支持。自提交此计划申请以来,Foster Yeoman Ltd已被Aggregate Industries Ltd收购,该公司证实该公司完全支持该计划申请和社区基金协议。

著录项

  • 来源
    《Mineral Planning》 |2006年第109期|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号