...
【24h】

Cadeby Quarry

机译:卡德比采石场

获取原文
获取原文并翻译 | 示例
           

摘要

Proposals by Tarmac Ltd for the continuation and extension of sand and gravel extraction at Cadeby Quarry were permitted in July by Leicestershire CC. The establishment of a Liaison Committee at the site was approved in August. The site would yield 0.945Mt of sand and gravel. Extraction has been carried out at the site since 1964 and restored progressively to agriculture by a combination of infilling with inert material and low level restoration. A concrete products factory west of the quarry processing plant was established in 1983 and subsequently extended under a number of planning permissions, some granted by Hinckley and Bosworth BC.
机译:莱斯特郡CC于7月份批准了Tarmac Ltd关于在Cadeby Quarry进行砂砾砾石开采的延续和扩展的提案。 8月批准了在现场建立联络委员会。该地点将产生0.945Mt的沙子和砾石。自1964年以来就在该地点进行了提取,并通过填充惰性材料和低水平的恢复相结合的方法逐步恢复了农业生产。采石场加工厂以西的混凝土制品厂成立于1983年,随后在一些计划许可下进行了扩建,其中一些许可由Hinckley和BC Bosworth授予。

著录项

  • 来源
    《Mineral Planning》 |2006年第109期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号