首页> 外文期刊>Mineral Planning >Industry body attacks system over delays in plan production
【24h】

Industry body attacks system over delays in plan production

机译:行业机构对计划生产延误的攻击系统

获取原文
获取原文并翻译 | 示例
           

摘要

The Mineral Products Association (MPA) has warned that failures in the current planning system could inhibit recovery of the development and construction industry and the mineral products sector. The organisation said England's plan-led system is no longer fit for purpose and has failed to deliver the certainty promised in the Planning and Compulsory Purchase Act 2004. In the minerals sector, fewer than 20 new-style minerals development plan documents have been completed out of the estimated 200 or more needed to give full coverage.
机译:矿物产品协会(MPA)警告说,当前计划系统的故障可能会阻碍开发和建筑业以及矿物产品行业的复苏。该组织表示,英格兰的计划主导系统已不再符合目的,并且未能实现《 2004年计划和强制性购买法》所承诺的确定性。在矿产领域,仅完成了不到20种新型矿产开发计划文件估计需要200或更多才能完全覆盖。

著录项

  • 来源
    《Mineral Planning》 |2010年第127期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号