首页> 外文期刊>Mineral Planning >Testing for shale gas refused in Vale of Glamorgan
【24h】

Testing for shale gas refused in Vale of Glamorgan

机译:在格拉摩根淡水河谷拒绝测试页岩气

获取原文
获取原文并翻译 | 示例
           

摘要

The Vale of Glamorgan Council has refused,against officer recommendation, a proposal todrill and test for gas in the CarboniferousLower Limestone Shales and Upper Devonianmeasures.The company said in the application that it wished to drill a 160mm diameter borehole and to take core samples with a view to future capture and supply of shale gas and also to test for the presence of conventional gas in the Upper Devonian measures. Drilling would take place to a depth of approximately 650m and formed part of the company's continuing program of sampling across South Wales.The operation would take up to ten weeks.
机译:根据官员的建议,Glamorgan委员会的Vale拒绝了在石炭纪下石灰岩页岩和上泥盆统中钻探和测试天然气的提议。该公司在申请中表示,希望钻一个直径为160mm的井眼,并用一个岩心取样。查看未来页岩气的捕获和供应,并测试上泥盆统中是否存在常规气。钻探将在约650m的深度进行,是公司持续在整个南威尔士进行采样计划的一部分,整个作业最多需要十周的时间。

著录项

  • 来源
    《Mineral Planning》 |2012年第139期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号