首页> 外文期刊>Mineral Planning >Novington Pit reconsidered
【24h】

Novington Pit reconsidered

机译:重新考虑诺文顿坑

获取原文
获取原文并翻译 | 示例
           

摘要

East Sussex CC in July was recommended to refuse the extraction and processing of sand with restoration to a landscaped lake together with importation of sand for blending at Novington Sandpit and Stanton's Farm extension, Plumpton by Boss Haulage/Dudman Group. In 1998 the Council had considered two applications concerning Novington sandpit: one was for the continued extraction of sand from the existing pit and the other was for the extension of mineral working into land to the east of the pit, known as Stanton's Farm. It had been resolved to approve them once a legal agreement had been signed to ensure that glazing complying with the Noise Insulation Regulations 1975 was installed at Stantons Farm Cottages, prior to the commencement of the development. The agreement had never been finalised. Accordingly the applications were reconsidered.
机译:建议Boss Haulage / Dudman Group在7月的East Sussex CC拒绝提取和加工沙石并将其恢复到风景优美的湖中,以及拒绝将沙石混入Novington Sandpit和Stanton's Farm Extension,Plumpton的沙石中。 1998年,理事会审议了有关诺文顿沙坑的两项申请:一项是从现有矿坑中继续开采沙子,另一项是将矿物开采工作扩展到该矿坑以东的土地,即斯坦顿农场。一旦签署法律协议以确保在开发开始之前,在斯坦顿农场农舍安装符合1975年隔音隔热法规的玻璃,就已经决定批准它们。该协议尚未最终确定。因此,重新考虑了申请。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号