...
首页> 外文期刊>Mineral Planning >Coating plant refusal due to emissions
【24h】

Coating plant refusal due to emissions

机译:涂料厂因排放而拒绝

获取原文
获取原文并翻译 | 示例
           

摘要

East Riding of Yorkshire Council in February refused an application for a roadstone coating plant and recycling facility in Goole, by Northern Construction Materials Ltd. Refusal was due to emissions from the operation of the coating plant being likely to give rise to significant adverse effects on nearby residents and at the premises of Britannia Foods with the potential for the tainting of food products. The development proposed was the construction and operation of a coated roadstone and recycling facility on land at West Dock within the Goole Dock system together with the importation and storage of raw material to produce the coated stone. The production capacity of the plant was 150,000tpa of coated stone. The majority of the raw materials required would be imported to the site by road and all of the coated roadstone produced delivered by road. There would be an area for recycling return loads.
机译:约克郡议会的东区骑兵组织于2月份拒绝了Northern Construction Materials Ltd申请在Goole的路石涂层厂和回收设施的申请。拒绝是由于涂层厂运营产生的排放物可能对附近地区产生重大不利影响居民和不列颠尼亚食品公司的所在地,可能会污染食品。建议的开发是在Goole Dock系统内的West Dock的土地上建设和运营带涂层的路石和回收设施,以及进口和存储生产带涂层的石材的原材料。该工厂的生产能力为15万吨/年涂层石材。所需的大多数原材料将通过公路进口到现场,所有涂层的路石都通过公路运输。会有一个回收返回负载的区域。

著录项

  • 来源
    《Mineral Planning》 |2003年第95期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号