首页> 外文期刊>Mineral Planning >Broad Oak Quarry
【24h】

Broad Oak Quarry

机译:阔橡采石场

获取原文
获取原文并翻译 | 示例
           

摘要

Variation of conditions to extend the period for completion of mineral extraction and completion of restoration at Broadoak Quarry, Ebchester, by Tarmac Ltd was approved by Northumberland CC in November. The proposed extension of the time limit and the resulting creation of new lagoons to serve Hollins Hill Quarry would not adversely affect the amenity of the adjoining land users, road users or the wildlife habitats. Broadoak and Hollins Hill quarries are two adjacent sand and gravel sites north of the village of Ebchester. The two sites are in different ownership and were originally separately operated. Both quarries are now operated by Tarmac Ltd. The two quarries share a lagoon area sited between the two quarries and a processing plant located within Hollins Hill Quarry.
机译:诺森伯兰CC于11月批准了改变条件,以延长Tarmac Ltd在埃布彻斯特的Broadoak采石场完成矿产开采和恢复工作的期限。拟议的时限延长以及由此产生的新泻湖为霍林斯山采石场服务不会对毗邻的土地使用者,道路使用者或野生动植物栖息地的舒适性产生不利影响。 Broadoak和Hollins Hill采石场是埃布切斯特村以北两个相邻的沙石场。这两个站点的所有权不同,并且最初是分开运行的。这两个采石场现在都由Tarmac Ltd.经营。这两个采石场共用一个泻湖区,位于两个采石场之间,并且位于Hollins Hill Quarry中。

著录项

  • 来源
    《Mineral Planning》 |2007年第111期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号