首页> 外文期刊>Mineral Planning >Mere Farm Quarry
【24h】

Mere Farm Quarry

机译:仅仅农场采石场

获取原文
获取原文并翻译 | 示例
           

摘要

A planning application by Hanson Aggregates to vary a condition relating to the final restoration of Mere Farm Quarry, Nether Alderley, was approved by Cheshire County Council in April. The site covered 104ha and had planning permission for the extraction of construction sand; workings were to cease and be fully restored by 2014. The final restoration concept of the permission had restoration to three distinct water bodies, with the largest in the central area, and smaller areas of water to the east and west. This also provided for significant areas of agricultural restoration and woodland planting.
机译:柴郡议会于4月份批准了Hanson Aggregates提出的一项规划申请,以改变与Nether Alderley梅尔农场采石场的最终修复有关的条件。该场地占地104公顷,并已获得开采建筑砂的规划许可;工程将停止并在2014年之前完全恢复。许可的最终恢复概念是恢复到三个不同的水体,其中最大的是中部地区,而较小的水域则是东西方。这也为农业恢复和林地种植提供了重要领域。

著录项

  • 来源
    《Mineral Planning》 |2007年第113期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号