首页> 外文期刊>Mineral Planning >Revisions to restoration scheme for Peak District quarry accepted
【24h】

Revisions to restoration scheme for Peak District quarry accepted

机译:接受山顶区采石场修复计划的修订

获取原文
获取原文并翻译 | 示例
           

摘要

The Peak District National Park Authority has concluded that an application to continue operations at Dale View quarry, near Matlock, without complying with several conditions attached to a consent granted in 2008, is in the public interest. The quarry lies on the western side of the Derwent Valley on the hillside that formed Stanton Moor. Dale View was one of two active gritstone quarries lying adjacent to each other, separated by a strip of unworked land. A consent in 2008 allowed the continued working of the quarry, together with an three-hectare extension to the west.
机译:峰区国家公园管理局的结论是,在不遵守2008年授予的附加条件的前提下,继续在Matlock附近的Dale View采石场运营的申请符合公共利益。该采石场位于形成斯坦顿荒原的山坡上的德文特河谷的西侧。戴尔维尤(Dale View)是两个活动的砂砾采石场之一,彼此相邻,被一块未加工的土地隔开。 2008年的一项同意允许该采石场继续工作,并向西扩展了三公顷的土地。

著录项

  • 来源
    《Mineral Planning》 |2014年第155期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号