首页> 外文期刊>Mineral Planning >1.85Mt Lafarge sand refusal
【24h】

1.85Mt Lafarge sand refusal

机译:1.85吨拉法基沙土拒绝

获取原文
获取原文并翻译 | 示例
           

摘要

Extraction of sand restoration at Burleigh Farm, Charing Heath, Ashford, by Lafarge Aggregates was refused permission by Kent CC in September against the officer recommendation to permit subject to conditions and completion of a S106 legal agreement. Consideration of this application had been deferred in July so that Members could view the site prior to determination.Lafarge proposed to extract 1.85Mt of sand at 100,000tpa in two phases and the restoration of the 18.2ha site to predominantly agriculture, with shrub and woodland planting. The scheme included associated process facilities, advanced planting areas and access via a railway underbridge to a new road junction, with localised widening and 4 passing bays to Charing Health Road, and the creation of a new bridleway between the haul road and the A20 running parallel to Charing Health Road.
机译:9月,肯特CC拒绝了拉法基矿业公司(Lafarge Aggregates)在阿什福德(Ashford)查林希思(Charing Heath)的伯利农场(Burleigh Farm)采砂修复的提议,肯特CC(Kent CC)拒绝了该官员的许可,要求该官员同意有条件并完成S106法律协议。拉法基(Lafarge)提议分两期推迟对该申请的审议,以便会员可以在确定之前查看该地点。拉法基(Lafarge)建议分两个阶段提取100,000tpa的1.85Mt沙子,并将18.2ha的地点恢复到主要为农业,包括灌木和林地。种植。该计划包括相关的处理设施,先进的种植区以及通过铁路地下桥通往新的道路交叉口,局部拓宽和通往查令健康路的4个过道海湾,以及在运输道路和A20平行运行之间建立新的bri道。到查令健康路。

著录项

  • 来源
    《Mineral Planning》 |2001年第89期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号