首页> 外文期刊>Mineral Planning >New conditions approved for Lancashire quarry and landfill site
【24h】

New conditions approved for Lancashire quarry and landfill site

机译:兰开夏郡的采石场和垃圾填埋场批准了新条件

获取原文
获取原文并翻译 | 示例
           

摘要

Lancashire County Council has approved new conditions for sand and gravel extraction followed by progressive restoration by importing non-hazardous waste materials after the application was deferred for consideration of tighter controls over phased restoration. The conditions were last reviewed in 1998 and provided for restoration by the importation of waste until April 2028.The operator estimated that 6,000 cubic metres of sand and gravel remained to be extracted over 12 hectares within the wider site and the remaining landfill capacity amounted to about 320,000 cubic metres, giving a life of four years.
机译:兰开夏郡议会已经批准了砂石砾石开采的新条件,随后考虑到对分阶段修复的严格控制,在推迟申请后通过进口无害废料来逐步修复。该条件于1998年进行了最后一次审查,并提供了直到2028年4月为止的废物进口才能恢复的条件。经营者估计,在更广阔的场地内12公顷土地上仍有6000立方米的沙子和砾石被开采,剩余的垃圾填埋量约为320,000立方米,使用寿命为四年。

著录项

  • 来源
    《Mineral Planning》 |2016年第165期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号