...
首页> 外文期刊>Mineral Planning >3Mt Tarmac refusal
【24h】

3Mt Tarmac refusal

机译:3吨柏油碎石拒绝

获取原文
获取原文并翻译 | 示例
           

摘要

An application for a new 3Mt mineral working south of Horstead was refused by Norfolk CC in July against officer advice. The reason was that it "in the context of existing planning permissions already active or about to be activated within the vicinity of the site, would lead to an over concentration of mineral activity". This would lead to cumulative impact to the detriment of the landscape, amenity and use of the highway. Two previous applications on the site were refused; one for 7.5Mt in January 2003, and one for 4Mt in May 2004 (see Mineral Planning 94 p.34 and 100 p.43). In each case, the grounds of refusal related solely to a lack of need for the mineral in the context of Minerals Local Plan policy where the landbank was over 7 years. An appeal has been lodged against the second refusal, and a public inquiry is scheduled for December 2005.
机译:霍福德(Horstead)以南的一种新的3Mt矿产的申请在7月被诺福克抄送委员会拒绝,反对军官的建议。原因是它“在现有的计划许可已经激活或即将在站点附近激活的情况下,将导致矿产活动过度集中”。这将导致累积影响,损害景观,便利性和高速公路的使用。该站点上的前两个申请被拒绝;一种在2003年1月为7.5Mt,另一种在2004年5月为4Mt(请参见《矿物规划》第94页第34页和第100页第43页)。在每种情况下,拒绝的理由仅与在土地储备超过7年的《矿产地方计划》政策的背景下缺乏矿产有关。已针对第二次拒绝提出上诉,定于2005年12月进行公开调查。

著录项

  • 来源
    《Mineral Planning》 |2005年第104期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号