【24h】

Oil & gas

机译:石油和天然气

获取原文
获取原文并翻译 | 示例
           

摘要

Surrey CC in April was recommended to refuse proposals by Star Energy UK Onshore Ltd at Albury Park, Albury, on noise grounds; the development involved the drilling of two new boreholes on an existing wellsite and the continued appraisal of the Albury Gasfield. The application was for retention of an existing appraisal wellsite compound, and associated access and roadway of some 1.97ha; the erection of new security fencing; the use of the appraisal site for the drilling of, and flow testing for, hydrocarbons from two appraisal boreholes; the retention of a transformer and switchroom and the retention of an existing appraisal well involving flow testing for hydrocarbons, the installation of appraisal facilities and provision of a container unit for use as offices and messroom, all for a temporary period of up to 3.5 years, with restoration to forestry.
机译:在噪音引起的情况下,4月建议萨里CC拒绝位于Albury Albury Park的Star Energy UK Onshore Ltd的提议;开发工作涉及在现有井场上钻两个新的井眼,并对Albury Gasfield进行持续评估。该申请是为了保留一个现有的评估井场大院,以及相关的通道和道路约1.97公顷;架设新的安全围栏;使用评估地点对来自两个评估井的碳氢化合物进行钻探和流量测试;保留变压器和开关室以及保留涉及碳氢化合物流量测试的现有评估井,评估设备的安装以及提供用作办公室和餐厅的集装箱单元的临时性期限,最长为3.5年,恢复林业。

著录项

  • 来源
    《Mineral Planning》 |2007年第111期|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号