首页> 外文期刊>Mineral Planning >Fife Council defers dimension stone proposal
【24h】

Fife Council defers dimension stone proposal

机译:横笛理事会推迟了维石提案

获取原文
获取原文并翻译 | 示例
           

摘要

A decision on an application for the extraction of dimension stone from Drumhead Quarry has been deferred by Falkirk Council due to traffic generation concerns. It had gone to committee with a recommendation to approve.The proposal was for the extraction of 72,000 tonnes of sandstone over a period of seven years.The site would be worked in three phases with an average of I0,300tpa of dimension stone and 8,000tpa of more fragmented, secondary stone, which would be used, for stone walls and garden use.The stone would be extracted by a mechanical excavator and the larger blocks reduced by a hammer and chisel.
机译:由于交通问题,福尔柯克委员会推迟了从Drumhead Quarry提取尺寸石材的申请决定。该提案已提交委员会审议通过,建议在七年内开采72,000吨砂岩,该厂将分三期进行,平均年产能为IOt 300tpa和8,000tpa碎片较多的次要石材,将用于石墙和花园用途。石材将通过机械挖掘机提取,较大的砖块将通过锤子和凿子减少。

著录项

  • 来源
    《Mineral Planning》 |2012年第139期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号