Proposals to construct a hydrocarbon drilling exploration and production site at the Somerby Exploration site, near Grove Farm, Gainsborough, were approved in September by Lincolnshire CC. The applicant wished to drill three wells to test for any discovered hydrocarbon bearing horizons and following successful testing the installation of appropriate production facilities. The existing field access to the site would be improved as part of the proposal. The 0.8ha application site was in open countryside. The main issue was whether the use made of the site would have a negative impact on the character and appearance of the locality and on the residential amenities of the nearest occupiers in terms of noise, nuisance and disturbance. Production testing would initially be planned to last for approximately 3-9 months. In the event that the well is discovered to be commercially viable, permanent production operation and equipment would be installed. Once the well had been exhausted, the borehole would be plugged and the site restored to its original condition.
机译:林肯郡CC于9月批准了在盖恩斯伯勒格罗夫农场附近的萨默比勘探场建设碳氢化合物钻井勘探和生产场的提议。申请人希望钻三口井以测试任何发现的含烃层位,并在成功测试合适的生产设施之后进行测试。该提案将改善对现场的现有现场访问。面积为0.8公顷的申请场地位于空旷的乡村。主要问题是,场地的使用是否会在噪声,扰民和干扰方面对当地居民的特征和外观以及就近居民的居住设施产生负面影响。最初计划将生产测试持续3到9个月。如果发现该井具有商业可行性,则将安装永久性生产作业和设备。一旦井用完了,将堵塞井眼,现场恢复到原始状态。

著录项

  • 来源
    《Mineral Planning》 |2006年第109期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号