...
首页> 外文期刊>Mineral Planning >Pilhough Quarry permission
【24h】

Pilhough Quarry permission

机译:Pilhough采石场许可

获取原文
获取原文并翻译 | 示例
           

摘要

The controversial application for a two-field extension to New Pilhough Quarry was permitted for Blockstone Ltd by the Peak District National Park Authority in January at a special meeting. A similar application was refused in May 2001 against officer advice and was subject to appeal (see Mineral Planning 88 p.9). This application included a significant additional benefit in that the right to work an additional area of Stanton Moor Quarry was to be relinquished. The applicant also offered a unilateral undertaking agreeing to work no part of the second field until such time as an appropriate planning application had been submitted for the construction of a new dedicated haul road off the Moor. Such an application for a full haul road may be allied to an application for further extension of the mineral quarrying area.
机译:峰区国家公园管理局在1月的一次特别会议上允许Blockstone Ltd.对有争议的将新Pilhough采石场进行两场扩建的申请。 2001年5月,类似的申请被拒绝接受军官的建议,并受到上诉(见《矿物规划》第88页第9页)。该应用程序具有显着的额外好处,因为将放弃在Stanton Moor Quarry的其他区域工作的权利。申请人还提供了单方面的保证,同意在提交适当的规划申请以在摩尔人附近修建一条新的专用运输道路之前,不从事第二领域的工作。这样的全程道路申请可以与进一步扩展矿物采石场的申请相关联。

著录项

  • 来源
    《Mineral Planning》 |2002年第90期|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号