首页> 外文期刊>Mineral Planning >3.6Mt RMC extensions/2.5Mt Norton Disney extension
【24h】

3.6Mt RMC extensions/2.5Mt Norton Disney extension

机译:3.6Mt RMC扩展/2.5Mt Norton Disney扩展

获取原文
获取原文并翻译 | 示例
           

摘要

Proposals to extract sand and gravel as an extension to the Norton Disney Quarry with restoration to landscaped lakes by RMC Aggregates (Eastern) Ltd were approved by Lincolnshire CC in May. Planning permission was granted to extract 2.46 Mt of sand and gravel from land at Tonge's Farm as an extension of the Norton Disney Quarry where it was anticipated that the existing permitted reserves would be exhausted by 2005. The proposal would extend the life of the quarry by 11 years (at a rate of production of around 250,000 tpa). The site covered an area of 54 ha that included the existing plant site (which would be retained for the duration of the development), Tonge's Farm and an interconnecting strip of land which would be used for the conveyor system. Although the Tonge's Farm part of the site extended over an area of 48.9 ha, mineral extraction would be confined to an area of 27 ha with the balance being excluded from working due to archaeological and environmental constraints. The site would be worked in eight phases using a hydraulic excavator, a mechanical loading shovel and a movable field conveyor system.
机译:林肯郡CC于5月批准了有关开采沙子和砾石的提议,以作为诺顿迪斯尼采石场的延伸,并由RMC Aggregates(Eastern)Ltd恢复景观湖。已计划获得许可,从Tonge's Farm的土地上开采2.46 Mt的沙子和砾石,作为Norton Disney Quarry的延伸,预计在2005年之前将耗尽现有的允许储量。该提案将延长Quarry的寿命11年(年产量约25万吨)。该场地占地54公顷,其中包括现有工厂场地(将在开发过程中保留),Tonge's农场和一条用于运输系统的互连土地。尽管该地点的Tonge's Farm部分占地48.9公顷,但由于考古和环境的限制,矿产开采仅限于27公顷,其余部分则被排除在工作范围之外。该场地将使用液压挖掘机,机械铲车和可移动的现场输送机系统分八个阶段进行工作。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号