...
首页> 外文期刊>Mining Mirror >DE BRON-MERRIESPRUIT: Moving up the value curve
【24h】

DE BRON-MERRIESPRUIT: Moving up the value curve

机译:DE BRON-MERRIESPRUIT:价值曲线上移

获取原文
获取原文并翻译 | 示例
           

摘要

Wits Gold is steadily moving its De Bron-Merriespruit (DBM) project up the value curve. The gold project, near the town of Virginia in the southern Free State, completed its pre-feasibility study stage at the end of the first quarter of 2012, and is progressing with the bankable feasibility phase. It is expected that the bankable feasibility will be complete towards the third quarter of 2013.Turgis Mining Consultants is responsible for the detailed engineering and mine designs, while MDM Engineering is focusing on the metallurgical plant design.
机译:Wits Gold正在稳步将其De Bron-Merriespruit(DBM)项目推向价值曲线。黄金项目位于自由州南部的弗吉尼亚镇附近,该项目于2012年第一季度末完成了预可行性研究阶段,并正在进入可融资可行性阶段。预计可融资可行性将于2013年第三季度完成。TurgisMining Consultants负责详细的工程和矿山设计,而MDM Engineering则专注于冶金工厂设计。

著录项

  • 来源
    《Mining Mirror》 |2013年第9期|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号