...
首页> 外文期刊>NGW's Gas Market Reconnaissance >The California Public Utilities Commission is expected to deny an application by Southern California Gas and San Diego Gas & Electric to build a 65-mile, 36-inch natural gas pipeline in Southern California
【24h】

The California Public Utilities Commission is expected to deny an application by Southern California Gas and San Diego Gas & Electric to build a 65-mile, 36-inch natural gas pipeline in Southern California

机译:预计加利福尼亚公用事业委员会将拒绝南加州天然气公司和圣地亚哥天然气与电力公司在南加州建设一条65英里,36英寸的天然气管道的申请

获取原文
获取原文并翻译 | 示例
           

摘要

An administrative law judge rejected the application in April and the commission is expected to follow that recommendation in a meeting today. The North-South Project was originally proposed in December 2013 and would run from Adelanto, California, south through the Cajon Pass and the San Bernardino National Forest before terminating in Moreno Valley.
机译:一名行政法法官于4月拒绝了该申请,预计委员会将在今天的会议上遵循该建议。南北项目最初于2013年12月提出,将从加利福尼亚的阿德兰托出发,向南穿过Cajon Pass和圣贝纳迪诺国家森林,然后终止于莫雷诺谷。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号