Since 2006, "FF System Bogl" concrete slabs have been in use in Germany on the through tracks forming the new high-speed line between Nuremberg and Ingolstadt. It was a logical next step to develop a prefabricated solution for switches and crossings too. As had already been done when developing the concrete slabs for holding plain track, designing the corresponding slabs to hold the components of switches and crossings also followed the fundamental ideas of producing high-quality, high-precision prefabricated parts in the factory and subsequently laying them at the construction site without needing to use support rails. As is an established feature of the Bogl system of slabs for ballastless track, the precision machining of the rail supports is done under computer control.