首页> 外文期刊>Oil & Gas Financial Journal >Halliburton's Well-Construction Team Collaboration Leads to Successful Shale Developments
【24h】

Halliburton's Well-Construction Team Collaboration Leads to Successful Shale Developments

机译:哈里伯顿的良好建设团队合作导致页岩开发成功

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Billiton Petroleum has expanded its fleet of North American shale rigs over the past six months, and relied heavily on their vendors for achieving their improved success. Some of the rigs employed Halliburton's Red Team, which increased operational efficiency as a result of each product service line (PSL) understanding how the related service lines work and interact with one another, as well as collaborating with the BHP Billiton Petroleum team. Information passes seamlessly between the Red Team for each product service line. Collaboration and data integration by a single source service provider increases operating efficiency while a burden is removed from the operator's drilling team to provide data and operational details to different service providers. The BHP Billiton Petroleum drilling team is afforded greater opportunity to focus on overall optimization and improved success while Halliburton provides wellbore evaluation, well construction, completions, and production sustainability.
机译:必和必拓石油公司在过去六个月中扩大了其北美页岩钻机的机队,并严重依赖其供应商来取得更大的成功。一些钻井平台聘用了哈里伯顿公司的红队,这是由于每条产品服务线(PSL)了解相关服务线如何工作并彼此互动以及与必和必拓石油团队合作而提高了运营效率。信息在红色团队之间无缝传递每个产​​品服务线。单一来源服务提供商的协作和数据集成可以提高运营效率,同时减轻了运营商钻井团队的负担,可以为不同的服务提供商提供数据和运营详细信息。必和必拓石油钻探团队有更多的机会专注于整体优化和提高的成功率,而哈里伯顿则提供井眼评估,油井建造,完井和生产可持续性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号