首页> 外文期刊>Oilsands review >Downward pressure Producers lose in Q4/2012 on market access issues and unplanned maintenance
【24h】

Downward pressure Producers lose in Q4/2012 on market access issues and unplanned maintenance

机译:下行压力生产商在2012年第四季度因市场准入问题和计划外的维护而蒙受损失

获取原文
获取原文并翻译 | 示例
           

摘要

MINING PRODUCERS ATHABASCA OIL SANDS PROJECT Marathon Oil Corporation 20 per cent interest Marathon Oil Corporation reported income for its oilsands mining segment of $19 million during the fourth quarter of 2012, down significantly from $65 million during the third quarter of the year. "Results were negatively impacted by unplanned downtime at the Scotford upgrader in the fourth quarter of 2012," the company says. "With less throughput at the upgrader, a higher percentage of lower-value products were sold, leading to lower price realizations." Marathon, which owns a non-operated minority stake in the Royal Dutch Shell plc-led project (and currently has the asset up for sale), reports synthetic crude oil realizations averaging $76.36 per barrel during the fourth quarter of 2012, compared to $81.13 during the third quarter of 2012, and $93.81 during the fourth quarter of 2011. Synthetic crude oil production at the project averaged 240,000 barrels per day during the fourth quarter of 2012, compared to 220,000 barrels per day during the fourth quarter of 2011. Marathon is projecting average production between 200,000 and 225,000 barrels per day for 2013.
机译:矿山生产商ATHABASCA油砂项目Marathon Oil Corporation拥有20%的权益Marathon Oil Corporation报告其油砂矿产部门的收入在2012年第四季度为1900万美元,大大低于该年第三季度的6500万美元。该公司表示:“结果受到Scotford升级器2012年第四季度计划外停机的不利影响。” “由于升级器的吞吐量降低,售出了更高百分比的低价值产品,从而降低了价格。”拥有皇家荷兰壳牌石油公司牵头的项目的非经营性少数股权的Marathon(目前有资产待售),2012年第四季度的合成原油平均价格为每桶76.36美元,而上半年为81.13美元。 2012年第三季度和2011年第四季度的价格为93.81美元。该项目的合成原油平均产量为2012年第四季度的每天24万桶,而2011年第四季度则为每天22万桶。 2013年平均每日产量在20万至225,000桶之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号