首页> 外文期刊>Sea Technology: Worldwide Information Leader for Marine Business, Science & Engineering >Dual Gradient Drilling Technology At Work After Long Development Cycle
【24h】

Dual Gradient Drilling Technology At Work After Long Development Cycle

机译:经过较长的开发周期后,双梯度钻探技术开始工作

获取原文
获取原文并翻译 | 示例
           

摘要

SEA CON (El Cajon, California) began supporting proof-of-concept dual gradient drilling (DGD) projects well over a decade ago and has since collaborated with major oilfield contractors to supply more than 1,000 connectors and cable assemblies. It has also provided cable and connector logistical project management for the installation of a seagoing DGD system on the dynamically positioned deepwater drill-ship Pacific Santa Ana, currently operating in the Gulf of Mexico. The complexity of outfitting the entire system resulted in SEA CON's participation in planning, system integration and commissioning support at a much higher level than is customary for a connector and cable system manufacturer.
机译:SEA CON(加利福尼亚州El Cajon)在十多年前就开始支持概念验证的双梯度钻井(DGD)项目,此后与主要的油田承包商合作,提供了1,000多个连接器和电缆组件。它还提供了电缆和连接器后勤项目管理,用于在动态定位的深水钻井船Pacific Santa Ana上安装远洋DGD系统,该船目前在墨西哥湾运营。装配整个系统的复杂性导致SEA CON参与计划,系统集成和调试支持的程度远高于连接器和电缆系统制造商的常规水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号