首页> 外文期刊>Pesticide(s) & Toxic Chemical News >Area source permitting requirements deferred for five years by EPA
【24h】

Area source permitting requirements deferred for five years by EPA

机译:EPA推迟了五年的区域源许可要求

获取原文
获取原文并翻译 | 示例
           

摘要

EPA has published a final rule deferring operating permits for area sources that are subject to National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements under the Clean Air Act. These sources include metal electroplating facilities, secondary lead smelters, dry cleaners, halogenated solvent cleaning machines, and ethylene oxide sterilization and fumigation equipment. The rule grants permitting authorities, such as states and localities, the discretion to defer the permits for such facilities until Dec. 9, 2004. It was published in the Dec. 14 Federal Register.
机译:EPA已发布一项最终规则,推迟遵守《清洁空气法》所规定的《有害空气污染物国家排放标准》(NESHAP)要求的区域源的操作许可。这些来源包括金属电镀设备,二次铅冶炼厂,干洗店,卤化溶剂清洗机以及环氧乙烷灭菌和熏蒸设备。该规则授予州和地方等许可当局酌情权将此类设施的许可推迟至2004年12月9日。该规则已在12月14日的联邦公报中发布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号