首页> 外文期刊>PetroChemical News >Petrokemya Installing ABS Capacity; Shaw Gets Jubail Project Contract
【24h】

Petrokemya Installing ABS Capacity; Shaw Gets Jubail Project Contract

机译:Petrokemya安装ABS容量;邵氏获得朱拜勒项目合同

获取原文
获取原文并翻译 | 示例
           

摘要

Jubail-Saudi Basil Industries Corp.'s (Sabic) Arabian Petrochemical Co. (Petro kemya) subsidiary is proceeding with previously announce* plans for a new 200,000-t/y acrylonitrile butadiene styren (ABS) plant in Jubail, Saudi Arabia (PCN, 1 Jan 07, p 4). The Shaw Group said it has received a contract to provid front end engineering design services, as well as procurement services for long lead equipment for the unit. Cost of the contract was not disclosed.
机译:Jubail-Saudi Basil Industries Corp.(Sabic)阿拉伯石油化工公司(Petro kemya)的子公司正在继续进行先前宣布的计划,*计划在沙特阿拉伯Jubail(PCN)新建一座年产20万吨的丙烯腈丁二烯苯乙烯(ABS)工厂,2007年1月1日,第4页)。邵氏集团(Shaw Group)表示,已收到一份合同,为该单位提供前端工程设计服务以及长铅设备的采购服务。合同成本没有透露。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号