首页> 美国政府科技报告 >Applying Constraint Satisfaction Techniques to Job Shop Scheduling
【24h】

Applying Constraint Satisfaction Techniques to Job Shop Scheduling

机译:约束满足技术在作业车间调度中的应用

获取原文

摘要

In this paper, we investigate the applicability of a constraint satisfactionproblem solving (CSP) model, recently developed for deadline scheduling, to more commonly studied problems of schedule optimization. Our hypothesis is two-fold: (1) that CSP scheduling techniques provide a basis for developing high-performance approximate solution procedures in optimization contexts, and (2) that the representational assumptions underlying CSP models allow these procedures to naturally accommodate the idiosyncratic constraints that complicate most real-world applications. We focus specifically on the objective criterion of makespan minimization, which has received the most attention within the job shop scheduling literature. We define an extended solution procedure somewhat unconventionally by reformulating the makespan problem as one of solving a series of different but related deadline scheduling problems, and embedding a simple CSP procedure as the subproblem solver. We first present the results of an empirical evaluation of our procedure performed on a range of previously studied bench-mark problems. Our procedure is found to provide strong cost/performance, producing solutions competitive with those obtained using recently reported shifting bottleneck search procedures at reduced computational expense. To demonstrate generality, we also consider application of our procedure to a more complicated, multi-product hoist scheduling problem. With only minor adjustments, our procedure is found to significantly outperform previously published procedures for solving this problem across a range of input assumptions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号