首页> 美国政府科技报告 >Analysis for Integrated Development Planning: Industry and Government Roles
【24h】

Analysis for Integrated Development Planning: Industry and Government Roles

机译:综合发展规划分析:产业与政府角色

获取原文

摘要

The Government/Industry Integrated Development Planning Process Action Team (PAT)was chartered by Lt Gen Fain, Commander of ASO, to identify and investigate methods to increase industry's involvement in the analysis portion of the development planning process. The first area of PAT activity determined the primary requirement is a closer integration of industry and government processes so that industry can plan for activities of the Technical Planning Integrated Product Teams (TPIPTs). The second area consisted of reviewing and refining the TPIPT's analysis processes and supporting analysis infrastructure. The third area concerned defining industry participation options. The path taken by the PAT was based upon the stipulation that the process must always be executable by the government. Industry participation was viewed as augmenting the basic government process. The process defined maintains the government's full control, permitting industry to participate at different levels of involvement and encouraging tailoring of the analysis process by the respective TPIPTs. In summary, the PAT found that it is beneficial and feasible for both the government and industry to integrate industry into the TPIPT analysis process. A follow-on PAT is needed to look at broader Air Force wide modernization issues and processes.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号