首页> 美国政府科技报告 >Industrial Technology Modernization Program. Project 20. Consolidation and Automation of Material and Tool Storage. Phase 2
【24h】

Industrial Technology Modernization Program. Project 20. Consolidation and Automation of Material and Tool Storage. Phase 2

机译:工业技术现代化计划。项目20.材料和工具存储的整合和自动化。阶段2

获取原文

摘要

The basic thrust of Project 20 is to integrate the functions of receiving, receiving inspection and central stores into a single computer controlled automated handling and storage system. This includes comprehensive planning, evaluation and justification in order to integrate our current functions into a modern automated facility. The benefits to be derived from the proposed system are increased labor productivity, improved inventory accuracy, reduced procurement lead time, and reduced inventory carrying costs. The integrated system will control incoming materials from the receiving dock into storage, from storage into receiving inspection, from inspection back into storage, out of storage to a picking area. All items will be handled by conveyor and stored in carousels, except pallet loads, with a computer tracking system maintaining inventory control and location of parts at all stages of the operation. Keywords: Automatic storage; Retrieval system; Industrial production. (SDW)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号