首页> 美国政府科技报告 >Monitoring Completed Navigation Projects, Lessons Learned III.
【24h】

Monitoring Completed Navigation Projects, Lessons Learned III.

机译:监测已完成的导航项目,经验教训III。

获取原文

摘要

This Coastal Engineering Technical Note (CETN) is the third in a series summarizing lessons learned from the MCNP Program, formerly the Monitoring Completed Coastal Projects (MCCP) Program. It covers four comprehensively monitored projects for which reports have been completed: Yaquina Bay North Jetty, OR (Hughes et al. 1995); Siuslaw River Jetty Spurs, OR (Pollock et al. 1995); Bums Harbor, IN (McGehee et al. 1997); and St. Paul Harbor, AK (Bottin and Eisses 1997). The CETN also includes six projects monitored under the Periodic Inspections work unit of the MCNP Program: Kahului Harbor and Laupahoehoe Boat-Launching Facility breakwaters, HI (Markle and Boc 1994); Crescent City Harbor breakwater, CA (Markle, Melby, and Kendall 1995); Cleveland Harbor east breakwater, OH (Bottin, Marcus, and Mohr 1995); Manasquan Inlet jetties, NJ (Bottin and Gebert 1995); Bums Harbor north breakwater, IN (Bottin and Matthews 1996); and Nawiliwili Harbor breakwater, HI (Bottin and Boc 1996). The elements of the comprehensively monitored projects included the collection of waves, wave-induced currents, bathymetry data, wave runup, underwater structure profiles, geophysical surveys, ground and photogrammetric survey data, and/or surveys of armor unit quality. Elements of the projects monitored under the Periodic Inspections work unit involved predominantly photogrammetric surveys of structures, with limited ground truthing surveys and armor unit quality surveys.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号