首页> 美国政府科技报告 >Brief Reconnaissance Study for the Addition of Hydropower for Millersville Dam, Millersville, North Carolina
【24h】

Brief Reconnaissance Study for the Addition of Hydropower for Millersville Dam, Millersville, North Carolina

机译:对北卡罗来纳州米勒斯维尔米勒斯维尔大坝增加水电的简​​要侦察研究

获取原文

摘要

The feasibility of developing hydroelectric power at the Millersville Dam in Millersville, North Carolina was studied. This dam, built in 1930 for hydropower generation, has a developable head of 32 ft. Information is presented on: the site characteristics; the potential developer, customer power demand; environmental, institutional and safety aspects of the proposed development; power plant potential and characteristics; and the calculation of the costs and benefits of the proposal. Based on the assumptions used, hydropower development at this site was found to be economically feasible if existing equipment is repaired. (ERA citation 07:062816)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号