首页> 美国政府科技报告 >Assessment of the Economic, Technical, and Environmental Feasibility of Developing, Constructing, and Operating a 25-Million-Gallon-Per-Year Grain-Ethanol-Production Facility. Volume IV. Economic and Financial Analysis, Management
【24h】

Assessment of the Economic, Technical, and Environmental Feasibility of Developing, Constructing, and Operating a 25-Million-Gallon-Per-Year Grain-Ethanol-Production Facility. Volume IV. Economic and Financial Analysis, Management

机译:评估开发,建设和运营每年2500万加仑谷物 - 乙醇生产设施的经济,技术和环境可行性。第四卷。经济和金融分析,管理

获取原文

摘要

The purpose of this study is to determine the economic, technical, and environmental feasibility of developing, constructing and operating a 25 million-gallon per year ethanol facility in northeastern Oklahoma. This volume contains economic and financial analysis portion of the investigation. The key criterion seen for project success for an ethanol plant was the selection of a site that can provide (1) necessary grain, energy, and labor resources; (2) flexible transportation methods and alternatives for receiving and shipping; (3) nearby markets for products and by-products; (4) an existing environmental quality able to withstand the minor impacts of the process; and (5) a receptive and growing business and community environment. Having completed more than 17 months of research, including 7 1/2 months on this study, Fulton Energy Corporation concludes that the proposed site not only meets, but exceeds these criteria. The study has also demonstrated the ability to produce a high quality product at a reasonable and competitive price with or without federal assistance or state assistance in the form of tax exemptions. All resources for the process are available nearby. The grains required come from carryover reserves, thus not impacting the food supply and the residual by-products are in high demand. The study has shown that the proposed plant enjoys the integrated assets of site, resources, market, efficient technologies, effective management, and environmental safety. Some permitting delays may be suffered but the overwhelmingly positive projections of this study are offsetting. (ERA citation 06:034476)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号