首页> 美国政府科技报告 >10 MWe Solar Thermal Central Receiver Pilot Plant: Solar Facilities Design Integration. Plant Support Subsystem Field-Erected Tanks - Construction Package No. 10A (RADL Item 7-42)
【24h】

10 MWe Solar Thermal Central Receiver Pilot Plant: Solar Facilities Design Integration. Plant Support Subsystem Field-Erected Tanks - Construction Package No. 10A (RADL Item 7-42)

机译:10兆瓦太阳能热中心接收器试验工厂:太阳能设施设计集成。工厂支持子系统现场安装的储罐 - 建筑包装第10a号(RaDL第7-42项)

获取原文

摘要

The work described includes fabrication, furnishing, delivering, unloading, storing, protecting, transporting, erecting, and testing the field-erected storage tanks, which consist of one raw water storage tank and one demineralized water tank, each complete with accessories. Other work included is the repair and re-test of any defects, surface preparation, prime painting, touch-up painting and lining. (ERA citation 10:051157)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号