首页> 美国政府科技报告 >Integrated Mined Area Reclamation and Land Use Planning: The Fulton County Case: A Workshop Synopsis
【24h】

Integrated Mined Area Reclamation and Land Use Planning: The Fulton County Case: A Workshop Synopsis

机译:综合矿区复垦和土地利用规划:富尔顿县案例:工作坊概要

获取原文

摘要

The RALI/DOE workshop on the subject of Integrated Mined-Area Reclamation and Land-Use Planning demonstrated benefits derived from a close working arrangement between the planning community of the coal mining industry. Both of these parties, along with environmental groups, state and federal agencies, and other special interest groups, were exposed to the types of information available to each other, to some of the problems involved in the solution of mutual difficulties, and to some of the inherent limitations of their individual fields. The Surface Mining Control and Reclamation Act (SMCRA) was introduced to the working sessions, and some of its provisions were tested in an exercise designed to represent a real-life situation. The most representative comment made about the new statute was in regard to the vast quantity of data that must be collected and analyzed in order to cope with the decision making mandated by the new Act. While SMRCA was generally held to increase the power of local decision makers in evaluating some mining and reclamation elements, and in determining standards in some areas would compromise the planners' ability to develop the best mixture of activities for their jurisdictions. The workshop used a modeling approach which simulated a real situation in land-use planning and mined-area reclamation. The participants were asked to make land-use plans while constantly faced, as had been the case in the real-life planning situation in this area, with changes in statutes, interests, and mining plans. (ERA citation 04:025269)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号