The turbine load rejection event can be caused by a loss of external electric load, that is, a loss of offsite power or a loss of electric power flow path to the transmission system. The turbine load rejection tests at 50 % and 100 % power for Yonggwang Nuclear Power Plant Unit 4 (YGN 4) were performed to demonstrate that the NSSS and turbine-generator systems can accommodate the load rejections by controlling operating parameter within the acceptable ranges, without causing reactor and turbine trip, and without opening primary and/or secondary safety valves. In this report, the measured plant operating parameters were compared against the expected values and the results predicted by LTC computer code to verify the plant design as well as to validate the computer code. From this evaluation, it is concluded that the control systems of YGN 4 properly responded to accommodate the events by performing its own functions during these tests and hence the turbine load rejection tests at 50 % and 100 % power were successfully performed meeting the test acceptance criteria. 8 tabs., 68 figs., 6 refs. (Author) .new. (Atomindex citation 27:063046)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号