首页> 美国政府科技报告 >Integrated Energy System with Beneficial Carbon Dioxide (CO2) Use, Final Scientific/Technical Report, Reporting Period Start Date: September 9, 2009; Reporting Period End Date: April 30, 2011.
【24h】

Integrated Energy System with Beneficial Carbon Dioxide (CO2) Use, Final Scientific/Technical Report, Reporting Period Start Date: September 9, 2009; Reporting Period End Date: April 30, 2011.

机译:具有有益二氧化碳(CO2)使用的综合能源系统,最终科学/技术报告,报告期开始日期:2009年9月9日;报告期末日期:2011年4月30日。

获取原文

摘要

This report presents an integrated energy system that combines the production of substitute natural gas through coal hydrogasification with an algae process for beneficial carbon dioxide (CO2) use and biofuel production (funded under Department of Energy (DOE) contract DE-FE0001099). The project planned to develop, test, operate and evaluate a 2 ton-per-day coal hydrogasification plant and 25-acre algae farm at the Arizona Public Service (APS) 1000 Megawatt (MW) Cholla coal-fired power plant in Joseph City, Arizona. Conceptual design of the integrated system was undertaken with APS partners Air Liquide (AL) and Parsons. The process engineering was separated into five major areas: flue gas preparation and CO2 delivery, algae farming, water management, hydrogasification, and biofuel production. The process flow diagrams, energy and material balances, and preliminary major equipment needs for each major area were prepared to reflect integrated process considerations and site infrastructure design basis. The total project also included research and development on a bench-scale hydrogasifier, one- dimensional (1-D) kinetic-model simulation, extensive algae stressing, oil extraction, lipid analysis and a half acre algae farm demonstration at APSs Redhawk testing facility.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号