首页> 美国政府科技报告 >Laboratory Tests of Two-Span Prestressed Reinforced Concrete Bridge Girders Constructed from Three Long Segments.
【24h】

Laboratory Tests of Two-Span Prestressed Reinforced Concrete Bridge Girders Constructed from Three Long Segments.

机译:双跨预应力钢筋混凝土桥梁三段长梁试验研究。

获取原文

摘要

Tests of two prestressed concrete composite bridge girders which were continuous over two spans are reported. Both were I-section girders with cast-in-place decks,and had spans of about 37ft (11 m),and were approximately 1/3scale models of structures spanning 125ft (38 m). Each girder was constructed from three segments which were joined end-to-end by cast-in-place concrete splices. Model 1was post-tensioned after erection of the girders and casting of the deck and splice concrete. The two end segments,each supported on the final abutments and on temporary supports located about 1/3of the span from the central pier,were pretensioned for their dead loads plus the deck concrete. The central segment,which was supported on the central pier of the structure plus the two temporary supports was precast reinforced concrete,plus a small amount of pretensioned reinforcement. Model 2was externally similar,but was not post-tensioned. The segments were pretensioned for the final moments,and were joined by splicing reinforcing bars which extended into the splice region. Both structures were subjected to a series of loadings to the service load,design ultimate,and high over-load levels. Both had capacities which were significantly higher than the design ultimate values. The capacities were generally predictable on the basis of flexural strength calculations,and shear did not cause major problems. Joint details in Model 1lead to difficulties in two tests,and this aspect of the design is discussed in detail.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号