Radioactive Waste: DOE Has Acted to Address Delay in New Facility at Livermore Laboratory, but Challenges Remain

机译:放射性废物:能源部已采取行动解决利弗莫尔实验室新设施的延误问题,但挑战仍然存在

获取原文

摘要

The Department of Energy's (DOE) Lawrence Livermore National Laboratory in Livermore, California, generates radioactive and hazardous wastes in the course of its research dealing with nuclear weapons. The laboratory's new Decontamination and Waste Treatment Facility is a $62 million complex that includes buildings designed for both temporarily storing waste and treating it for offsite disposal. Although construction was completed in 2001, the storage building did not begin operating until September 2002, and the treatment buildings remain unused to this day. GAO was asked to identify the cause of the delay in initiating storage and treatment operations at the facility, the effects of the delay in initiating treatment operations, and the steps taken to ensure that the latest estimated date for initiating treatment operations at the facility can be met.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号