Glen Canyon Dam Beach/Habitat-Building Test Flow: An 'Ex Post' Analysis ofHydropower Cost

机译:格伦峡谷大坝海滩/栖息地建设测试流程:水电成本的'事后'分析

获取原文

摘要

A 7-day controlled flood was conducted in late March and early April of 1996 forresearch purposes. This short-duration high release was designed to rebuild high elevation sandbars, deposit nutrients, restore backwater channels, and provide some of the dynamics of a natural system. The goal was to test hypotheses about sediment movements and the response of aquatic and terrestial habitats to flood events. This report describes the resultant economic and financial impact of the test flow on the hydropower system. There were two sources of economic and financial impact associated with the beach/habitat-building test flow--changes in the timing and amount of hydropower produced and the costs of the research. The purpose of this report is to describe the economic and financial impacts on the hydropower system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号