Tunnel Operations Study

机译:隧道运营研究

获取原文

摘要

In June 2000, the State of Alaska Department of Transportation and Public Facilities completed construction of the Whittier Access Project by converting the existing 2.5-mile Whittier Tunnel into the world's only dual-use highway/rail tunnel with one-way reversible highway traffic. Since the tunnel was opened, there has been a significant increase in both highway and rail traffic through the tunnel, which has resulted in occasional delays to both highway and railroad traffic. The objective of this research project is to determine the current and future needs of the users of the Whittier Tunnel; evaluate current schedule and tunnel operations for regulatory compliance and efficiency; develop a visual model to illustrate problems and evaluate possible solutions. This research project concluded that access to the City of Whittier has improved since construction but the tunnel is operated below capacity when switched to highway from rail. It also concluded that the current tunnel schedule is the most efficient schedule to meet combined rail/highway demands and identified the biggest impact on operations-loaded freight trains from Whittier to Bear Valley and Railroad system failures. This research report makes recommendations to reduce delay and improve tunnel operations.

著录项

  • 作者

  • 作者单位
  • 年度 2013
  • 页码 1-108
  • 总页数 108
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

    Whittier Tunnel; Whittier(Alaska);

    机译:惠蒂尔隧道;惠蒂尔(阿拉斯加州);

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号