首页> 外国专利> The foundation's installation method, using precast concrete to build power stations, means that all manufacturing work is carried out in different locations than its final location.

The foundation's installation method, using precast concrete to build power stations, means that all manufacturing work is carried out in different locations than its final location.

机译:基金会的安装方法是使用预制混凝土建造电站,这意味着所有制造工作都在最终位置以外的其他位置进行。

摘要

(c) It includes: GT. P n amp; oacute; n.n.a.l. P M amp; eacute; instaci amp; oace; n.n.a.l.; instaci amp; oacute; n; N.N de instaci amp; oacu; oacute; n because it includes the following steps: / Lt.(a) Plan amp; oacute; excavate amp; oacute; on site; / P according to the location of the planned foundation;(b) Ingenier amp; Iacute; a de fabricaci amp; oacute; N Y izaje de Las fondades for transportation through P amp, uacute, blicos and existing equipment; / P (c) Planificaci amp; oacute; n de instalaci amp; oacute; n de fundaci ó n para la Secretar í a de transport y izaje equipment will not be able to enter or transfer in places where ACI amp; oacute; N, / P gt is installed;(d) Transaction and settlement procedure; oacute; N and purchase foundation from cement and amp suppliers; oacute; provide prefabricated assembly; / P gt according to project requirements;(e) Oacute; n locate the foundation with the necessary land mobile equipment and tools from the designated location, leaving behind the materials removed due to the use and amperage; Aacute; the materials used for filling will not interfere with the movement of the transportation and placement equipment; or Future architecture, / P (f) Posici amp's route; oacute's route; according to Ingenier amp, Iacute, project a, lt, / P gt's foundation's route at the excavation site;(g) Installation and amp; oacute; foundation in locations planned in accordance with CI amp, oacute, installation ACI amp, oacute, oacute, installation ACI amp, oacute, transportation equipment and izaje, / P (h) Fill the unused land of the foundation with excavated materials, and then fill the; oacute; land cover; / P gt with compact equipment;
机译:(c)它包括:GT。 P GT; n amp; ac n.n.a.l. P GT; Mamp;敏锐惯性放大器ace n.n.a.l .;惯性放大器ac n; N.N de instaci amp; oacu; ac n,因为它包含以下步骤:/Lt。(a)计划放大器; ac挖掘放大器ac现场; / P>根据计划地基的位置;(b)工程师放大器;不雅织物放大器ac N Y izaje de Las fondades,用于通过P amp,uacute,blicos和现有设备进行运输; / P>(c)平面放大器; ac n de instalaci amp; ac秘密运输工具将无法在ACI放大器的地方进入或转移。 ac N, / P gt已安装;(d)交易和结算程序; ac N从水泥和功放供应商那里购买基础; ac提供预制装配; / P gt根据项目要求;(e)急性; n从指定位置用必要的陆上移动设备和工具放置基础,并保留因使用和安培数而移走的材料;急性用于填充的材料不会干扰运输和放置设备的移动;或未来架构, / P>(f)Posici amp的路线; oacute的路线;根据Ingenier amp,Iacute的说法,在挖掘现场投影a,lt,/ p gt的地基路线;(g)安装和放大器; ac在根据CI amp,oacute,安装ACI amp,oacute,oacute,安装ACI amp,oacute,运输设备和izaje计划的位置规划基金会; / P>(h)用挖掘的材料填满基金会的未使用土地,然后将其填满; ac土地覆盖; /紧凑型设备;

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号