Optimization system is dispatched in start and stop schedule creating equipment and start and stop

机译:在开始和停止时间表创建设备以及开始和停止中调度优化系统

摘要

PROBLEM TO BE SOLVED: To optimize a start-stop schedule because an extra load is imposed on a plant apparatus operated by a start-stop schedule that is not optimized.SOLUTION: A start-stop schedule creation unit 2 adds a weight on the basis of requirement to the path of operation items of a plurality of operated plant apparatuses and virtual operation items among the paths of plant apparatus operation items determined by logic and virtual operation items, and finds a critical path. Then, the creation unit calculates, for plant apparatus operation items and virtual operation items of a path different from the critical path, a timing at which to start and stop plant apparatus operation items and virtual operation items tracing back from the trailing end of the critical path, and creates a plant apparatus start-stop schedule in which the start-stop timing is optimized on the basis of requirement.SELECTED DRAWING: Figure 1
机译:解决的问题:由于在未优化的起停时间表所操作的工厂设备上施加了额外的负荷,因此优化起停时间表。解决方案:起停时间表创建单元2在此基础上增加权重。对由逻辑和虚拟操作项目确定的工厂设备操作项目的路径中的多个被操作工厂设备的操作项目的路径和虚拟操作项目的要求,并找到关键路径。然后,创建单元针对与关键路径不同的路径的工厂设备操作项目和虚拟操作项目计算从关键点的尾端追溯的开始和停止工厂设备操作项目和虚拟操作项目的时刻。路径,并创建工厂设备的起停时间表,在该时间表中,根据需要优化起止时间。选定的图纸:图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号