首页>
外国专利>
EROSION CONTROL NET AND EROSION CONTROL NET CONSTRUCTION METHOD
EROSION CONTROL NET AND EROSION CONTROL NET CONSTRUCTION METHOD
展开▼
机译:侵蚀控制网和侵蚀控制网的构建方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method of constructing a square net and a square net. More particularly, the invention relates to a method of constructing a square net and a square net by connecting a cushion portion to an intersecting portion of a wire net, Which is capable of being freely deformed, thereby restricting the movement of the earth rock until the earth rock moved by the flow velocity of the four-way dam reaches a maximum value. The four-way net according to the present invention is a wire net installed and fixed to a four-way dam; And a cushioning portion which is fastened and fixed at a portion where the wire net intersects and absorbs a pressure applied to the wire net by the earth stone, wherein the cushioning portion includes: a first body that is closely attached to the rear of the wire net; And a second body that is in close contact with the front side of the wire net and is pressed and fastened to the first body.
展开▼