首页>
外国专利>
- - METHOD AND APPARATUS FOR ASSISTING STRATEGY MAP MANAGEMENT BASED ON SCHEDULE-ASSESSMENT ITEM AND TODO-ASSESSMENT ITEM
- - METHOD AND APPARATUS FOR ASSISTING STRATEGY MAP MANAGEMENT BASED ON SCHEDULE-ASSESSMENT ITEM AND TODO-ASSESSMENT ITEM
展开▼
机译:-基于时间表评估项目和待办事项评估项目的战略地图管理的方法和装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
The business strategy map management method is performed in the business strategy map management server connected to the business strategy map user terminal. The method comprises the steps of: (1) determining a schedule time line defined by a start schedule and a deadline with respect to each of at least one service constituting a project read out from the schedule-evaluation memory area; (2) a project step for providing a task performance organization that is subordinate to the schedule-evaluation item read from the task performance organization memory area; and a step of providing a to-do item having a to-do item having a to-do evaluation, which is evaluated through a to-do creator, with respect to a to-do list specifying a to-do list handler with respect to the to-do list defined by the to-do generator′s need.
展开▼