首页> 外国专利> Method for enhanced cold steam turbine start in a supplementary fired multi gas turbine combined cycle plant

Method for enhanced cold steam turbine start in a supplementary fired multi gas turbine combined cycle plant

机译:辅助燃烧多燃气轮机联合循环电厂中增强冷汽轮机启动的方法

摘要

A method for enhanced cold (or warm) steam turbine start in a supplementary fired multi-gas turbine combined cycle plant is disclosed. Boiler supplementary firing, which is normally used to increase steam flow when the plant gas turbine is at maximum load, is used to augment steam production with a partly loaded, temperature matched gas turbine. This is done to satisfy minimum required steam flow for a cold (or warm) steam turbine start. Lighting the supplementary firing burners in the heat recovery steam generator/boiler and setting them at a minimum or low heat load serves to add enough steam, at the proper temperature, to insure a successful cold or warm steam turbine start when the gas turbine load and related steam production capacity from the gas turbine exhaust flow are limited by the need to match the required steam temperature and/or maintain low gas turbine exhaust emissions.
机译:公开了一种用于在辅助燃烧式多燃气轮机联合循环工厂中增强冷(或暖)汽轮机启动的方法。锅炉补充燃烧通常用于在工厂燃气轮机处于最大负载时增加蒸汽流量,它用于通过部分负载,温度匹配的燃气轮机提高蒸汽产量。这样做是为了满足冷(或热)汽轮机启动所需的最小蒸汽流量。点燃热回收蒸汽发生器/锅炉中的辅助燃烧器并将其设置为最小或低热负荷,可在适当的温度下添加足够的蒸汽,以确保当燃气轮机负载和燃气轮机排气流产生的相关蒸汽生产能力受到匹配所需蒸汽温度和/或保持低燃气轮机排气排放的需求的限制。

著录项

  • 公开/公告号US9732635B2

    专利类型

  • 公开/公告日2017-08-15

    原文格式PDF

  • 申请/专利权人 GENERAL ELECTRIC COMPANY;

    申请/专利号US201514699224

  • 发明设计人 BRUCE CHARLES MARTINDALE;

    申请日2015-04-29

  • 分类号F02C1;F01K7/16;F01K23/10;F02C6/18;F02C3/04;F01K13/02;

  • 国家 US