首页> 外国专利> First aid treatment device of heat transfer tube and first aid treatment method of heat transfer tube

First aid treatment device of heat transfer tube and first aid treatment method of heat transfer tube

机译:传热管的急救处理装置及传热管的急救处理方法

摘要

PROBLEM TO BE SOLVED: To perform the emergency treatment of a heat transfer pipe in which leakage occurs by simple treatment in a short recovery construction period.SOLUTION: A heat transfer pipe holding tool 20 is used in a state that downward openings 61A, 61C at a pipe header side of a cutting point are plugged with plugs 10 by cutting a heat transfer pipe 6B' in which the leakage has occurred at an upper part of a furnace ceiling wall when the leakage of an internal fluid occurs in any of a plurality of the heat exchanger transfer pipes which are aggregated by the upper pipe header at the furnace ceiling wall of a boiler, and suspended downward of the furnace ceiling wall. The heat transfer pipe holding tool has a locking implement 21 which is inputted from an upward opening 61B at a cut heat transfer pipe 60B, and descends by its own weight in the cut heat transfer pipe 60B, and a locking rope 22 which supports the locking implement 21 inputted into the cut heat transfer pipe 60B from the upward opening 61B side, and the locking implement 21 comprises an engagement element 24e which pressure-contacts with an inner wall of the cut heat transfer pipe 60B by an operation of the locking rope 22, and is engaged with the inner wall.SELECTED DRAWING: Figure 4
机译:解决的问题:对在短时间内恢复施工期间发生泄漏的传热管进行应急处理。解决方案:使用传热管固定工具20的状态是向下开口61A,61C切断点的集管侧通过切断传热管6B'而被塞子10堵塞,在该传热管6B'中,当内部流体的泄漏在多个炉中的任何一个中发生时,在炉顶壁的上部发生了泄漏。换热器传热管由锅炉的炉顶壁上的上集管总成,并悬挂在炉顶壁的下方。传热管保持工具具有:锁定工具21,其从切开的传热管60B的上方的开口61B输入,并由于自身的重量而下降到切分的传热管60B;以及支撑该锁定的锁定绳22。从向上的开口61B侧输入到切断的传热管60B中的机具21,并且锁定装置21包括接合元件24e,该接合元件24e通过锁定绳22的操作与切断的传热管60B的内壁压力接触。并与内壁接合。选定的图纸:图4

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号