首页>
外国专利>
Steel pipe pile construction jig, steel pipe pile construction equipment and steel pipe pile construction method
Steel pipe pile construction jig, steel pipe pile construction equipment and steel pipe pile construction method
展开▼
机译:钢管桩施工夹具,钢管桩施工设备及钢管桩施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a steel pipe construction jig, a steel pipe construction apparatus, and a steel pipe construction method which, when a steel pipe pile with a helical blade formed at the outer periphery of a steel pipe to extend consecutively from its one end toward the other end is press-fitted into the ground fix the pile firmly.;SOLUTION: A steel pipe pile 10 has a steel pipe 12 and a helical blade 14 formed helically at the outer periphery of the steel pipe to extend consecutively from its one end toward the other end, and is revolved and press-fitted into the ground. The steel pipe construction jig has a shaking-stopper member 110 through which the steel pipe pile is put when press-fitted into the ground and, has a height 1.5 times or more the pitch of the helical blade, an inner diameter equal to or larger than the outer diameter of the helical blade, and a cylindrical inner wall surface 114 that comes in contact with or approach the front end of the helical blade when the steel pipe pile is put.;COPYRIGHT: (C)2011,JPO&INPIT
展开▼