首页> 外国专利> MAKING A SHEEP FOR A UNDERGROUND DAY

MAKING A SHEEP FOR A UNDERGROUND DAY

机译:在地下一天养羊

摘要

In forming a mine shaft for an underground mine, earth excavated by a boring machine (21) is transported upwardly by handling unit (22) to a transfer station (33) where it is transferred into skips 36 which are raised and lowered along skip guides 38 within the shaft hole (19) for transport of the excavated material to an earth surface region. Transfer station (33) is moved downwardly as excavation progresses.
机译:在形成用于地下矿井的矿井时,将由镗床(21)挖掘的泥土通过装卸单元(22)向上输送到转运站(33),在此转运站被转运到料斗36中,料斗36沿料斗导轨上升和下降轴孔(19)中的图38所示的孔用于将挖掘出的材料输送到地面区域。随着挖掘的进行,转运站(33)向下移动。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号