首页> 外国专利> HYBRID BUILDING CONSTRUCTION METHOD COMBINING WET AND DRY CONSTRUCTION METHODS, CAPABLE OF EFFECTIVELY SHORTENING A CONSTRUCTION PERIOD BY CONSTRUCTING AT LEAST TWO FLOORS AT THE SAME TIME

HYBRID BUILDING CONSTRUCTION METHOD COMBINING WET AND DRY CONSTRUCTION METHODS, CAPABLE OF EFFECTIVELY SHORTENING A CONSTRUCTION PERIOD BY CONSTRUCTING AT LEAST TWO FLOORS AT THE SAME TIME

机译:湿法和干法相结合的混合建筑施工方法,能够同时建造至少两层楼,有效地缩短了施工周期

摘要

PURPOSE: A hybrid building construction method combining wet and dry construction methods is provided to maximally shorten a construction period when constructing a high-rise building.;CONSTITUTION: A hybrid building construction method combining wet and dry construction methods comprises the following steps: successively producing columns(20) with a unit(U) which is set to have the height of more than two floors by pouring concrete on site and combining an intermediate floor horizontal member(40) to columns with a predetermined height if the curing strength of column concrete is more than preset strength.;COPYRIGHT KIPO 2013
机译:目的:提供一种结合了湿法和干法施工方法的混合建筑施工方法,以最大程度地缩短建造高层建筑时的施工周期。;构成:一种结合了湿法和干法施工方法的混合建筑施工方法,包括以下步骤:连续生产通过在现场浇筑混凝土并将中间地板水平构件(40)组合到具有预定高度的柱子(如果柱混凝土的固化强度)而将单元(U)设置为具有两层以上高度的柱子(20)超过预设强度。; COPYRIGHT KIPO 2013

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号