首页> 外国专利> A CONSTRUCTION PERIOD SHORTENING TYPE TOPDOWN STRUCTURE USING THE UNDERGROUND CORE WALL COLUMN AND THE TEMPORARY POLE FOR TRANSMITTING THE STRUCTURAL LOAD ON THE GROUND FLOOR AND CONSTRUCTION PERIOD SHORTENING TYPE TOPDOWN CONSTRUCTION METHOD USING THE SAME

A CONSTRUCTION PERIOD SHORTENING TYPE TOPDOWN STRUCTURE USING THE UNDERGROUND CORE WALL COLUMN AND THE TEMPORARY POLE FOR TRANSMITTING THE STRUCTURAL LOAD ON THE GROUND FLOOR AND CONSTRUCTION PERIOD SHORTENING TYPE TOPDOWN CONSTRUCTION METHOD USING THE SAME

机译:建筑时期缩短型圆形结构,采用地下芯壁柱和临时杆,用于在地板上传输结构负荷和施工时期缩短型拓扑施工方法

摘要

The present invention includes a temporary post erected adjacent to the core wall, one end joined to the temporary post and the other end fixed to the core wall, and a connecting part connecting the temporary post and the core wall to each other, wherein the temporary post is, the core wall Installed before construction, the lower part is buried in the basement floor, and the upper part is joined to the horizontal member on the ground floor, and the upper part is extended to the upper part of the ceiling of the ground floor and erected. structure can be provided. According to the above description, since the construction of the ground floor can be started even before the construction of the first basement core is completed, the construction period can be effectively shortened.
机译:本发明包括邻近芯壁的临时柱,一端连接到临时柱,另一端固定到芯壁上,以及连接临时柱和芯壁彼此的连接部分,其中临时 柱子是施工前安装的芯壁,下部埋在地板上,上部连接到地板上的水平构件,上部延伸到天花板的上部 底楼并竖立起来。 可以提供结构。 根据以上描述,由于甚至在完成第一地下室芯的结构之前可以开始磨地的结构,因此可以有效地缩短施工时段。

著录项

  • 公开/公告号KR20210155380A

    专利类型

  • 公开/公告日2021-12-22

    原文格式PDF

  • 申请/专利权人 임인식;

    申请/专利号KR1020210077447

  • 发明设计人 임인식;이범택;한주옥;

    申请日2021-06-15

  • 分类号E02D29/045;E04B1/19;

  • 国家 KR

  • 入库时间 2022-08-24 22:57:19

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号