首页> 外国专利> Maintenance plan development method

Maintenance plan development method

机译:维修计划制定方法

摘要

A maintenance planning method for turbomachines, especially for gas turbine aircraft engines, is disclosed. In an embodiment, the method includes: a) data obtained from the previous maintenance of turbomachines is stored in a database in a structured manner, where the data especially correlates maintenance work carried out with operating loads of a serviced turbomachine; b) in order to pre-plan the maintenance of a turbomachine undergoing further maintenance, the maintenance work to be carried out is planned in terms of type and sequence on the basis of the database; and c) the turbomachine undergoing further maintenance is inspected for the final planning of the maintenance, and the type and/or sequence of the maintenance work to be carried out, which was specified during the pre-planning of the maintenance, is adapted and/or supplemented on the basis of the inspection.
机译:公开了一种用于涡轮机,特别是用于燃气涡轮飞机发动机的维护计划方法。在一个实施例中,该方法包括:a)将从涡轮机的先前维护中获得的数据以结构化的方式存储在数据库中,其中,所述数据尤其将所进行的维护工作与所服务的涡轮机的运行负载相关联; b)为了预先计划进行进一步维护的涡轮机的维护,要在数据库的基础上按照类型和顺序计划要进行的维护工作; c)对进行进一步维护的涡轮机进行检查,以进行维护的最终计划,并在维护的预计划期间对要进行的维护工作的类型和/或顺序进行调整和//或根据检查进行补充。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号